Skip to content

US-034 - Flat roofs need a crew of at least three

As a planner, I want the assignment flow to put at least three people on a flat roof, so that the ballast is carried safely.

Acceptance criteria:

  • Installation_Assign_Crew raises the crew on flat roofs
  • Mariia's crew cap from US-018 still wins when the two disagree
Owner You
Branch features/US-034-crew-override
Delivered in Lab 2.7 - Resolve a Git merge conflict with a teammate

All the stories of the backlog

Questions and comments