US-026 - Crew capacity reference data and nightly recalculation¶
As a planner, I want capacity rules per crew type and a nightly job that recalculates them, so that the planning board is right every morning and I get a summary of it in my inbox.
Acceptance criteria:
- 12 Crew Capacity records exist in every org
- The batch is scheduled nightly
- The planner receives the morning summary email
| Owner | You |
| Branch | features/US-026-crew-capacity-data |
| Delivered in | Lab 2.4 - Ship reference data and a batch with deployment actions |
All the stories of the backlog